Solar + Wind + Battery + IoT - 24/7 Energy
Hybrid Solar+Wind+Battery System
Combine solar, wind, battery storage, IoT control. 24/7 operation, grid independence, 30-40% faster ROI.
System Components
Solar Panels
Mono PERC 450-550W, efficiency 21-23%, 25-year warranty
Main source during day, contributes 60-70% output
Wind Turbines
10-100kW HAWT/VAWT, operates 3-25 m/s wind speed
Supplement at night & rainy season, contributes 30-40% output
Battery Storage
LiFePO4 50-500kWh, 6000+ cycles, DoD 90%, smart BMS
Store surplus, supply at night, 8-24 hour backup
Hybrid Inverter
50-500kW bidirectional, MPPT tracking, grid-tie/off-grid
Coordinate 4 sources: Solar, Wind, Battery, Grid
IoT Controller
Edge computing gateway, AI optimization, 24/7 monitoring
Auto switch source by electricity price & weather
Why Choose Hybrid?
| System | Uptime | Capacity | ROI | Grid Dependency |
|---|---|---|---|---|
| Solar Only | ~8 hours/day (daytime) | 100% | 8-10 years | 60% grid dependent |
| Wind Only | ~12 hours/day (unstable) | 100% | 10-12 years | 70% grid dependent |
| Hybrid Solar+Wind+Battery | 24/7 (continuous) | 150-200% | 5-7 years | 90% independent or 100% off-grid |
Estimate Hybrid System
Calculator below calculates Solar portion. We will then consult on Wind (30-40% of Solar capacity) and Battery (1-2 day reserve).
💡 Hybrid systems typically need: Solar base + Wind = 1.3x-1.5x Solar + Battery = 1.5x-2x daily capacity
Solar Energy System Estimate
Enter information to calculate suitable capacity
Panel Specifications: Monocrystalline 450W
ROI Analysis
Phu Quoc Resort 600kW Hybrid
500kW Solar + 100kW Wind + 400kWh Battery + IoT
Investment: ~$600,000 USD
- →Electricity savings: $12,000/month
- →Feed-in tariff: $3,000/month
- →Total income: $180,000/year
- →ROI: 3.3 years, 22-year remaining profit
o blackout worry, 24/7 operation
0-100% bill reduction
o dependency on rising electricity prices
roperty value increase 10-15%
reen image, attract customers
Featured Hybrid Projects
Phu Quoc Resort 600kW
500kW Solar + 100kW Wind + 400kWh Battery
100% off-grid, $15,000/month savings, 3.5-year ROI
Binh Duong Factory 1.5MW
1MW Solar + 500kW Wind + 800kWh Battery + IoT
85% grid reduction, early fault detection, 5-year ROI
Da Nang Urban Area 3MW
2MW Solar + 1MW Wind + 2MWh Battery + Microgrid
Supply 300 households, load balancing, 6-year ROI
Get Hybrid System Quote
GoldenEnergy team will survey location, measure wind & solar for 3 months, design optimal system, provide detailed quote & financing support
Register free survey